Leopold Sedar Senghor Airport (Dakar)
Leopold Sedar Senghor Airport (Dakar)
In 2006, the Senegalese Government asked to the Libanese Contractor: ‘Zackhem’ to extend the current airport, and build a new departure terminal.
Together with ‘SGE Equip’ (Daikin’s sales contact in Senegal), they studied different air conditioning solutions and finally opted for a Daikin Air cooled Chiller systems.
| Installer | SGE Equip |
| Year | 2007 |
| Units | 2 x EWAP460MBYNN & Duct FCU |
| Capacity | 920 Kw |

![]() |
|

